loading…

Home » Services » Fire Protection » Case Study

Case Study: Fire Protection

  • Client: Pharmaceutical Manufacturer
  • Project: Refurbishment of Laboratories and Facilities
  • Location: Cheshire

Project Background

Fire stopping and steelwork protection. To retrospectively apply ductwork fire protection to a refurbished area to both existing and new extract ductwork.

The Solution

The Client required a lightweight solution that could be installed to the existing system. Green Contract Services proposed the use of Foil Faced Mineral Wool Rockwool Fire Pro range of ductwork slab to cover the ductwork, supports and hangers to the required fire rating, including the sealing of the penetration positions where ductwork passes through the fire compartmentation positions.

  • Construction Period: 3 weeks
  • Year Complete: 2007
  • Contract Value: £10,000

 

 

 

 

 

 

Contact Us for more details or Telephone 01270 760379

About Us

Find out more about Green Contract Services
Read More.

 

Download our full brochure

PDF - 4.3mb

Company Brochure - 4.3mb

 

Accreditations and Memberships

OHSAS 18001 logoISO 14001 logoDesign Best Practise

ISO 9001UKAS Inspection

Investors in PeopleLegionella Association logoConstructionLine logo